Porthcawl

Overview

Rest Bay phase 2 Care Home, Porthcawl

All Associated Groundworks & Civils Package to deliver a care home.

  • Project Value – £0.95m

  • Main Contractor – Intelle

  • Commencement Date – Dec 2019

  • Project Duration – 18 months

  • Contract – NEC Option B

Require specialist groundworks and civil engineering to the very highest of standards?

Scope of Works

104 Sewer Connection, 278wks, Construction of adoptable road and footways, 278 works, Bulk Earthworks, disposal of Surplus Inert Material off site, Foundations with bolt assembly boxes to carry steel frame,Lift pits, Waterproofing, Substructure masonry, Concrete floors and finishes, Foul and Storm Drainage, SAB features and permeable paving, Main Services/utilities, Effluent tanks & Associated drainage, Soft and hard landscaping.